Final consultation material upload
We have posted below some of the images that we intend to show this evening at the consultation. There is also a link to download our consultation panels This is inevitably a reduced format and we hope that as many of you as possible will be able to attend this evening’s presentation in the … Read more
Final Consultation material
We had intended to post a summary of the draft masterplan onto this blog today. However, due to the Borough not having signed-off on the content, they have asked us not to post anything yet. We are disappointed that this is the case and it is unlikely that we will be able to issue material … Read more
Final Consultation 20th April 6.30pm
The second consultation was pushed back by a couple of weeks and we now find ourselves in April. Our final consultation, to which all are invited, is now scheduled for 20th April. Many of you have participated in the earlier consultation activities in January, and the aim of this event is to feed back on the … Read more
OPTIONS for discussion
We have looked at initial ways of individually addressing the “ISSUES and CONSTRAINTS” raised in the previous post. None of the below images represents an overall masterplan design. If you would like to make a comment, please do so via the link to our online questionnaire. CLICK ON IMAGES IF YOU NEED TO ENLARGE SOLVING … Read more
Initial Public Consultation
Members of the design team will be in Walthamstow town centre at the following times and places. We would very much like to hear your views on the area, and on our initial ideas. Saturday 22nd January: 10.00am-12.00pm: in Town Square near High Street 1.00pm-3.00pm: inside Library entrance 3.00pm-5.00pm: inside The Mall, Selborne Walk Wednesday … Read more
Opportunities and Constraints of Arcade Site and Town Square
These diagrams aim to describe the Opportunities and Constraints of the Arcade Site and Town Square area, identified by the design team. If you would like to make a comment, please do so via the link to the online questionnaire. STRENGTHS/ OPPORTUNITIES (numbered on drawing) 1. Avenue of mature trees running between Selborne Road and … Read more
Complete the Initial Consultation Questionnaire
We would welcome 10 or 15 minutes of your time to express your views on various aspects of the Arcade Site and Town Square and gardens, at the first stage of the masterplan. We have published a questionnaire via the below link (please click), and invite as many of you to complete it as possible. … Read more