Final consultation material upload

We have posted below some of the images that we intend to show this evening at the consultation.   There is also a link to download our consultation panels This is inevitably a reduced format and we hope that as many of you as possible will be able to attend this evening’s presentation in the … Continue reading

Final Consultation material

We had intended to post a summary of the draft masterplan onto this blog  today.  However, due to the Borough not having signed-off on the content, they have asked us not to post anything yet. We are disappointed that this is the case and it is unlikely that we will be able to issue material … Continue reading

OPTIONS for discussion

We have looked at initial ways of individually addressing the “ISSUES and CONSTRAINTS” raised in the previous post.  None of the below images represents an overall masterplan design.  If you would like to make a comment, please do so via the link to our online questionnaire. CLICK ON IMAGES IF YOU NEED TO ENLARGE SOLVING … Continue reading

Opportunities and Constraints of Arcade Site and Town Square

These diagrams aim to describe the Opportunities and Constraints of the Arcade Site and Town Square area, identified by the design team. If you would like to make a comment, please do so via the link to the online questionnaire. STRENGTHS/ OPPORTUNITIES (numbered on drawing) 1. Avenue of mature trees running between Selborne Road and … Continue reading